Techno Blender
Digitally Yours.

Mumbai Airport Resumes Operation Post Annual Monsoon Maintenance

0 45


Last Updated: October 19, 2022, 14:32 IST

Chhatrapati Shivaji Maharaj International Airport (CSMIA) in Mumbai (Photo: IANS)

Mumbai has recorded over 400 mm of rainfall this year which made the inspection of the runways critical for enhancing safe departures and landings

After remaining closed for 6 hours for post-monsoon runway maintenance works, the Chhatrapati Shivaji Maharaj International Airport became operational again at 5 p.m., officials said here on Tuesday. The planned maintenance which would also facilitate seamless aircraft movement and ensure passenger safety was taken up from 11 a.m. – 5 p.m. on both the intersecting runways — RWY 14/32 and RWY 09/27.

Mumbai has recorded over 400 mm of rainfall this year which made the inspection of the runways critical to enhancing safe departures and landings of aircraft.

Also Read: Mumbai Airport Runway Closed Tomorrow From 11 AM To 5 PM, Here’s Why

The makeover included the installation of the runway edge lights on RWY 14/32, trenching work for underground cables for segregation of Aeronautical Ground Lights at the beginning of RWY 09/27, validation of the strength of the runway end safety area on the intersection besides repairs for normal wear and tear.

A team also inspected over 5,000 aeronautical lights installed, drain pits and chambers adjacent to the runway strip, cables for critical lighting, and navigational aids. Among the busiest in the country, the CSMIA witnesses around 800 flight movements daily.

Read all the Latest Auto News and Breaking News here


Last Updated: October 19, 2022, 14:32 IST

Chhatrapati Shivaji Maharaj International Airport (CSMIA) in Mumbai (Photo: IANS)

Chhatrapati Shivaji Maharaj International Airport (CSMIA) in Mumbai (Photo: IANS)

Mumbai has recorded over 400 mm of rainfall this year which made the inspection of the runways critical for enhancing safe departures and landings

After remaining closed for 6 hours for post-monsoon runway maintenance works, the Chhatrapati Shivaji Maharaj International Airport became operational again at 5 p.m., officials said here on Tuesday. The planned maintenance which would also facilitate seamless aircraft movement and ensure passenger safety was taken up from 11 a.m. – 5 p.m. on both the intersecting runways — RWY 14/32 and RWY 09/27.

Mumbai has recorded over 400 mm of rainfall this year which made the inspection of the runways critical to enhancing safe departures and landings of aircraft.

Also Read: Mumbai Airport Runway Closed Tomorrow From 11 AM To 5 PM, Here’s Why

The makeover included the installation of the runway edge lights on RWY 14/32, trenching work for underground cables for segregation of Aeronautical Ground Lights at the beginning of RWY 09/27, validation of the strength of the runway end safety area on the intersection besides repairs for normal wear and tear.

A team also inspected over 5,000 aeronautical lights installed, drain pits and chambers adjacent to the runway strip, cables for critical lighting, and navigational aids. Among the busiest in the country, the CSMIA witnesses around 800 flight movements daily.

Read all the Latest Auto News and Breaking News here

FOLLOW US ON GOOGLE NEWS

Read original article here

Denial of responsibility! Techno Blender is an automatic aggregator of the all world’s media. In each content, the hyperlink to the primary source is specified. All trademarks belong to their rightful owners, all materials to their authors. If you are the owner of the content and do not want us to publish your materials, please contact us by email – [email protected]. The content will be deleted within 24 hours.

Leave a comment