Techno Blender
Digitally Yours.

Rs 6500 Cr Tunnel From Mumbai’s Eastern Freeway to Marine Drive Will Cut Down Travel Time to 10 Min

0 39


An underground tunnel between Marine Drive and the Eastern Freeway has been approved by the Mumbai Metropolitan Region Development Authority (MMRDA). The project worth Rs 6500 crore gets the green signal after MMRDA chaired a meeting with the top official by regarding the same. The report says once the project gets done, it will help the commuters to save time by more than 10 minutes.

In a 154th Authority Meeting, which was held in March, MMRDA permitted the construction of a 3.8 km long tunnel road to provide vehicular connectivity between Orange Gate, the Eastern Freeway, and Marine Drive on the Mumbai Coastal Road.

Also read: Mumbai Water Cut: Repair Work Pushes City into Crisis, Some Areas Will See Above 15% Decrease

The upcoming Mega Project will be the third and longest road tunnel, with 2+2 lines in the city. As per the official reports, the tunnel will be built via Sardar Vallabhbhai Patel (SVP) Road around 30 metres below the Grant Road and Girgaum stations of Metro 3.

It has been reported that the underground tunnel will greatly reduce the area’s traffic congestion by easing numerous important routes, including the Chhatrapati Shivaji Maharaj Terminus (CMST) intersections, Crawford Market, and General Post Office (GPO). Additionally, it will facilitate access to the Navi Mumbai International Airport, linking South Mumbai traffic to the future Trans Harbour Link.

Apart from this, as part of the Mumbai-Ahmedabad bullet train project, the city soon will have a 21-km long tunnel between Bandra Kurla Complex and Shilphata station in Thane. The report says the upcoming project will be the longest tunnel in the country.

Read all the Latest Auto News here


An underground tunnel between Marine Drive and the Eastern Freeway has been approved by the Mumbai Metropolitan Region Development Authority (MMRDA). The project worth Rs 6500 crore gets the green signal after MMRDA chaired a meeting with the top official by regarding the same. The report says once the project gets done, it will help the commuters to save time by more than 10 minutes.

In a 154th Authority Meeting, which was held in March, MMRDA permitted the construction of a 3.8 km long tunnel road to provide vehicular connectivity between Orange Gate, the Eastern Freeway, and Marine Drive on the Mumbai Coastal Road.

Also read: Mumbai Water Cut: Repair Work Pushes City into Crisis, Some Areas Will See Above 15% Decrease

The upcoming Mega Project will be the third and longest road tunnel, with 2+2 lines in the city. As per the official reports, the tunnel will be built via Sardar Vallabhbhai Patel (SVP) Road around 30 metres below the Grant Road and Girgaum stations of Metro 3.

It has been reported that the underground tunnel will greatly reduce the area’s traffic congestion by easing numerous important routes, including the Chhatrapati Shivaji Maharaj Terminus (CMST) intersections, Crawford Market, and General Post Office (GPO). Additionally, it will facilitate access to the Navi Mumbai International Airport, linking South Mumbai traffic to the future Trans Harbour Link.

Apart from this, as part of the Mumbai-Ahmedabad bullet train project, the city soon will have a 21-km long tunnel between Bandra Kurla Complex and Shilphata station in Thane. The report says the upcoming project will be the longest tunnel in the country.

Read all the Latest Auto News here

FOLLOW US ON GOOGLE NEWS

Read original article here

Denial of responsibility! Techno Blender is an automatic aggregator of the all world’s media. In each content, the hyperlink to the primary source is specified. All trademarks belong to their rightful owners, all materials to their authors. If you are the owner of the content and do not want us to publish your materials, please contact us by email – [email protected]. The content will be deleted within 24 hours.

Leave a comment